Home / Fiat 500e Hatchback 24 kWh / Herne Bay / Aberdare

Fiat 500e Hatchback 24 kWh route from Herne Bay to Aberdare

Starting fully charged. Distance 246 miles. Driving time 5 hr 3 min. Charge time 1 hr 7 min

Starting charge: Fully charged | 75% charged | 50% charged | 25% charged

Driving Step Drive to Osprey Charging, Maidstone ME16 0ZP, UK

  • Drive 33 miles in 39 min
  • Charge level at destination 56%

Charging Stop Charge for 5 min

  • Operator Osprey Charging
  • Connector CCS (50.0kW)
  • Charge to 74%

Driving Step Drive to POD Point (UK), Weybridge KT13 0XR, UK

  • Drive 48 miles in 54 min
  • Charge level at destination 10%

Charging Stop Charge for 9 min

  • Operator POD Point (UK)
  • Connector CCS (50.0kW)
  • Charge to 44%

Driving Step Drive to InstaVolt, 210 Wharfedale Rd, Winnersh, Wokingham RG41 5TP, UK

  • Drive 25 miles in 37 min
  • Charge level at destination 10%

Charging Stop Charge for 17 min

  • Operator InstaVolt
  • Connector CCS (50.0kW)
  • Charge to 70%

Driving Step Drive to InstaVolt, 43 Colbourne St, Swindon SN1 2EQ, UK

  • Drive 45 miles in 56 min
  • Charge level at destination 10%

Charging Stop Charge for 14 min

  • Operator InstaVolt
  • Connector CCS (50.0kW)
  • Charge to 62%

Driving Step Drive to Osprey Charging, 4 Oaktree Cres, Bradley Stoke, Bristol BS32 9AD, UK

  • Drive 39 miles in 47 min
  • Charge level at destination 10%

Charging Stop Charge for 20 min

  • Operator Osprey Charging
  • Connector CCS (50.0kW)
  • Charge to 82%

Driving Step Drive to Aberdare

  • Drive 54 miles in 1 hr 6 min
  • Charge level at destination 10%

Routes Calculated by EVNAViQ

Routes are based on:

Default charge point operators:

For full route details and to calculate your own routes including multiple stops, round trips and 40+ charge point operators download EVNAViQ for free: