Home / Fiat 500e Hatchback 42 kWh / Herne Bay / Aberdare

Fiat 500e Hatchback 42 kWh route from Herne Bay to Aberdare

Starting fully charged. Distance 238 miles. Driving time 4 hr 36 min. Charge time 44 min

Starting charge: Fully charged | 75% charged | 50% charged | 25% charged

Driving Step Drive to InstaVolt, 210 Wharfedale Rd, Winnersh, Wokingham RG41 5TP, UK

  • Drive 103 miles in 1 hr 57 min
  • Charge level at destination 23%

Charging Stop Charge for 24 min

  • Operator InstaVolt
  • Connector CCS (50.0kW)
  • Charge to 71%

Driving Step Drive to Osprey Charging, 4 Oaktree Cres, Bradley Stoke, Bristol BS32 9AD, UK

  • Drive 81 miles in 1 hr 32 min
  • Charge level at destination 10%

Charging Stop Charge for 20 min

  • Operator Osprey Charging
  • Connector CCS (50.0kW)
  • Charge to 51%

Driving Step Drive to Aberdare

  • Drive 54 miles in 1 hr 6 min
  • Charge level at destination 10%

Routes Calculated by EVNAViQ

Routes are based on:

Default charge point operators:

For full route details and to calculate your own routes including multiple stops, round trips and 40+ charge point operators download EVNAViQ for free: