Home / Hyundai IONIQ Electric / Aberdare / Aberdeen

Hyundai IONIQ Electric route from Aberdare to Aberdeen

Starting fully charged. Distance 535 miles. Driving time 10 hr 13 min. Charge time 2 hr 24 min

Starting charge: Fully charged | 75% charged | 50% charged | 25% charged

Driving Step Drive to Shell UK, A5 Watling St, Cannock WS11 1SL, UK

  • Drive 127 miles in 2 hr 33 min
  • Charge level at destination 14%

Charging Stop Charge for 29 min

  • Operator Shell UK
  • Connector CCS (44.0kW)
  • Charge to 70%

Driving Step Drive to Osprey Charging, Queen St, Preston PR1 4HZ, UK

  • Drive 89 miles in 1 hr 41 min
  • Charge level at destination 10%

Charging Stop Charge for 34 min

  • Operator Osprey Charging
  • Connector CCS (44.0kW)
  • Charge to 77%

Driving Step Drive to Ionity, Gretna DG16 5HQ, UK

  • Drive 98 miles in 1 hr 52 min
  • Charge level at destination 10%

Charging Stop Charge for 37 min

  • Operator Ionity
  • Connector CCS (44.0kW)
  • Charge to 80%

Driving Step Drive to Chargeplace Scotland, 5-23 A820, Dunblane FK15, UK

  • Drive 104 miles in 1 hr 54 min
  • Charge level at destination 10%

Charging Stop Charge for 43 min

  • Operator Chargeplace Scotland
  • Connector CCS (44.0kW)
  • Charge to 87%

Driving Step Drive to Aberdeen

  • Drive 114 miles in 2 hr 11 min
  • Charge level at destination 10%

Routes Calculated by EVNAViQ

Routes are based on:

Default charge point operators:

For full route details and to calculate your own routes including multiple stops, round trips and 40+ charge point operators download EVNAViQ for free: