Home / Volkswagen e-Up! 2014-2016 / Hayes / Aberdare

Volkswagen e-Up! 2014-2016 route from Hayes to Aberdare

Starting fully charged. Distance 164 miles. Driving time 3 hr 29 min. Charge time 37 min

Starting charge: Fully charged | 75% charged | 50% charged | 25% charged

Driving Step Drive to InstaVolt, 210 Wharfedale Rd, Winnersh, Wokingham RG41 5TP, UK

  • Drive 24 miles in 32 min
  • Charge level at destination 57%

Charging Stop Charge for 7 min

  • Operator InstaVolt
  • Connector CCS (50.0kW)
  • Charge to 87%

Driving Step Drive to InstaVolt, 43 Colbourne St, Swindon SN1 2EQ, UK

  • Drive 45 miles in 56 min
  • Charge level at destination 10%

Charging Stop Charge for 13 min

  • Operator InstaVolt
  • Connector CCS (50.0kW)
  • Charge to 78%

Driving Step Drive to Osprey Charging, 4 Oaktree Cres, Bradley Stoke, Bristol BS32 9AD, UK

  • Drive 39 miles in 47 min
  • Charge level at destination 10%

Charging Stop Charge for 7 min

  • Operator Osprey Charging
  • Connector CCS (50.0kW)
  • Charge to 49%

Driving Step Drive to Osprey Charging, 34 A48, Newport NP20, UK

  • Drive 22 miles in 29 min
  • Charge level at destination 10%

Charging Stop Charge for 10 min

  • Operator Osprey Charging
  • Connector CCS (50.0kW)
  • Charge to 64%

Driving Step Drive to Aberdare

  • Drive 31 miles in 42 min
  • Charge level at destination 10%

Routes Calculated by EVNAViQ

Routes are based on:

Default charge point operators:

For full route details and to calculate your own routes including multiple stops, round trips and 40+ charge point operators download EVNAViQ for free: