Home / Volkswagen e-Up! 2020- / Hendon / Aberdare

Volkswagen e-Up! 2020- route from Hendon to Aberdare

Starting fully charged. Distance 174 miles. Driving time 3 hr 31 min. Charge time 27 min

Starting charge: Fully charged | 75% charged | 50% charged | 25% charged

Driving Step Drive to InstaVolt, 210 Wharfedale Rd, Winnersh, Wokingham RG41 5TP, UK

  • Drive 38 miles in 52 min
  • Charge level at destination 67%

Charging Stop Charge for 5 min

  • Operator InstaVolt
  • Connector CCS (40.0kW)
  • Charge to 79%

Driving Step Drive to Osprey Charging, 4 Oaktree Cres, Bradley Stoke, Bristol BS32 9AD, UK

  • Drive 81 miles in 1 hr 32 min
  • Charge level at destination 10%

Charging Stop Charge for 22 min

  • Operator Osprey Charging
  • Connector CCS (40.0kW)
  • Charge to 56%

Driving Step Drive to Aberdare

  • Drive 54 miles in 1 hr 6 min
  • Charge level at destination 10%

Routes Calculated by EVNAViQ

Routes are based on:

Default charge point operators:

For full route details and to calculate your own routes including multiple stops, round trips and 40+ charge point operators download EVNAViQ for free: